• Previous Article
    Good programs in the RSS model without concavity of a utility function
  • JIMO Home
  • This Issue
  • Next Article
    A novel approach in uncertain programming part II: a class of constrained nonlinear programming problems with interval objective functions
October  2006, 2(4): 387-398. doi: 10.3934/jimo.2006.2.387

Multiple workshift options in aggregrate production Multiple workshift options in aggregrate production

1. 

Graduate School of Management, Kent State University, Kent, Ohio, United States

2. 

Department of Applied Mathematics, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China

3. 

Department of Applied Mathematics, The Hong Kong Polytechnic University, Kowloon, Hong Kong, China

Received  March 2006 Revised  August 2006 Published  October 2006

Second and third shift considerations are important for production planning and scheduling in most manufacturing facilities. A careful literature survey revealed that multiple workshift considerations have not been previously discussed for general aggregate production planning models. In this paper, we propose a mixed integer logic for permitting the opening or closing of second and third shifts of production within a generic model having linear and quadratic cost components. We illustrate the results of the model on a hypothetical data set. The model permits different costs for opening and closing the extra shifts and provides for a minimum required work force size for the extra shifts.
Citation: M. D. Troutt, S. H. Hou, W. K. Pang. Multiple workshift options in aggregrate production Multiple workshift options in aggregrate production. Journal of Industrial & Management Optimization, 2006, 2 (4) : 387-398. doi: 10.3934/jimo.2006.2.387
[1]

Mahmoud Ameri, Armin Jarrahi. An executive model for network-level pavement maintenance and rehabilitation planning based on linear integer programming. Journal of Industrial & Management Optimization, 2017, 13 (5) : 1-17. doi: 10.3934/jimo.2018179

[2]

Dariush Mohamadi Zanjirani, Majid Esmaelian. An integrated approach based on Fuzzy Inference System for scheduling and process planning through multiple objectives. Journal of Industrial & Management Optimization, 2017, 13 (5) : 1-25. doi: 10.3934/jimo.2018202

[3]

Tien-Fu Liang, Hung-Wen Cheng. Multi-objective aggregate production planning decisions using two-phase fuzzy goal programming method. Journal of Industrial & Management Optimization, 2011, 7 (2) : 365-383. doi: 10.3934/jimo.2011.7.365

[4]

Lou Caccetta, Elham Mardaneh. Joint pricing and production planning for fixed priced multiple products with backorders. Journal of Industrial & Management Optimization, 2010, 6 (1) : 123-147. doi: 10.3934/jimo.2010.6.123

[5]

Louis Caccetta, Syarifah Z. Nordin. Mixed integer programming model for scheduling in unrelated parallel processor system with priority consideration. Numerical Algebra, Control & Optimization, 2014, 4 (2) : 115-132. doi: 10.3934/naco.2014.4.115

[6]

Elham Mardaneh, Ryan Loxton, Qun Lin, Phil Schmidli. A mixed-integer linear programming model for optimal vessel scheduling in offshore oil and gas operations. Journal of Industrial & Management Optimization, 2017, 13 (4) : 1601-1623. doi: 10.3934/jimo.2017009

[7]

Nicolas Boizot, Jean-Paul Gauthier. On the motion planning of the ball with a trailer. Mathematical Control & Related Fields, 2013, 3 (3) : 269-286. doi: 10.3934/mcrf.2013.3.269

[8]

Wan Nor Ashikin Wan Ahmad Fatthi, Adibah Shuib, Rosma Mohd Dom. A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse. Journal of Industrial & Management Optimization, 2016, 12 (2) : 431-447. doi: 10.3934/jimo.2016.12.431

[9]

Urmila Pyakurel, Tanka Nath Dhamala. Evacuation planning by earliest arrival contraflow. Journal of Industrial & Management Optimization, 2017, 13 (1) : 489-503. doi: 10.3934/jimo.2016028

[10]

Matthias Gerdts, René Henrion, Dietmar Hömberg, Chantal Landry. Path planning and collision avoidance for robots. Numerical Algebra, Control & Optimization, 2012, 2 (3) : 437-463. doi: 10.3934/naco.2012.2.437

[11]

Rafael Caballero, Trinidad Gomez, Julian Molina, Osvaldo Fosado, Maria A. Leon, Madelen Garofal, Beatriz Saavedra. Sawing planning using a multicriteria approach. Journal of Industrial & Management Optimization, 2009, 5 (2) : 303-317. doi: 10.3934/jimo.2009.5.303

[12]

Tzu-Li Chen, James T. Lin, Shu-Cherng Fang. A shadow-price based heuristic for capacity planning of TFT-LCD manufacturing. Journal of Industrial & Management Optimization, 2010, 6 (1) : 209-239. doi: 10.3934/jimo.2010.6.209

[13]

Kegui Chen, Xinyu Wang, Min Huang, Wai-Ki Ching. Salesforce contract design, joint pricing and production planning with asymmetric overconfidence sales agent. Journal of Industrial & Management Optimization, 2017, 13 (2) : 873-899. doi: 10.3934/jimo.2016051

[14]

Yi Jing, Wenchuan Li. Integrated recycling-integrated production - distribution planning for decentralized closed-loop supply chain. Journal of Industrial & Management Optimization, 2018, 14 (2) : 511-539. doi: 10.3934/jimo.2017058

[15]

Abdelghani Bouras, Ramdane Hedjar, Lotfi Tadj. Production planning in a three-stock reverse-logistics system with deteriorating items under a periodic review policy. Journal of Industrial & Management Optimization, 2016, 12 (3) : 1075-1089. doi: 10.3934/jimo.2016.12.1075

[16]

Abdelghani Bouras, Lotfi Tadj. Production planning in a three-stock reverse-logistics system with deteriorating items under a continuous review policy. Journal of Industrial & Management Optimization, 2015, 11 (4) : 1041-1058. doi: 10.3934/jimo.2015.11.1041

[17]

Juan Carlos López Alfonso, Giuseppe Buttazzo, Bosco García-Archilla, Miguel A. Herrero, Luis Núñez. A class of optimization problems in radiotherapy dosimetry planning. Discrete & Continuous Dynamical Systems - B, 2012, 17 (6) : 1651-1672. doi: 10.3934/dcdsb.2012.17.1651

[18]

G. Idone, A. Maugeri. Variational inequalities and a transport planning for an elastic and continuum model. Journal of Industrial & Management Optimization, 2005, 1 (1) : 81-86. doi: 10.3934/jimo.2005.1.81

[19]

Mehmet Önal, H. Edwin Romeijn. Two-echelon requirements planning with pricing decisions. Journal of Industrial & Management Optimization, 2009, 5 (4) : 767-781. doi: 10.3934/jimo.2009.5.767

[20]

Jiuping Xu, Pei Wei. Production-distribution planning of construction supply chain management under fuzzy random environment for large-scale construction projects. Journal of Industrial & Management Optimization, 2013, 9 (1) : 31-56. doi: 10.3934/jimo.2013.9.31

2018 Impact Factor: 1.025

Metrics

  • PDF downloads (6)
  • HTML views (0)
  • Cited by (1)

Other articles
by authors

[Back to Top]