`a`
Journal of Industrial and Management Optimization (JIMO)
 

Integrated recycling-production-distribution planning for decentralized closed-loop supply chain
Page number are going to be assigned later 2017

doi:10.3934/jimo.2017058      Abstract        References        Full text (478.0K)      

Yi Jing - College of Management, Chongqing University of Technology, NO.69, Hongguang Road, Banan District, Chongqing 400054, China (email)
Wenchuan Li - School of Economics and Management, Nanchang Hangkong University, NO.696, Fenghenan Road, Honggutan District, Nanchang 330063, China (email)

1 R. A. Aliev, B. Fazlollahi, B. G. Guirimov, et al., Fuzzy-genetic approach to aggregate production-distribution planning in supply chain management, Information Sciences, 177 (2007), 4241-4255.
2 S. M. J. M. Al-e-hachem, H. Malekly and M. B. Aryanezhad, A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty, International Journal of Production Economics, 134 (2011), 28-42.
3 S. H. Amin and G. Q. Zhang, A proposed mathematical model for closed-loop network configuration based on product life cycle, International Journal of Advanced Manufacturing Technology, 58 (2012), 791-801.
4 P. Amorim, H. O. Günther and B. Almada-Lobo, Multi-objective integrated production and distribution planning of perishable products, International Journal of Production Economics, 138 (2012), 89-101.
5 G. Barbarosolu, Hierarchical design of an integrated production and 2-echelon distribution system, European Journal of Operational Research, 118 (1999), 464-484.
6 M. Boudia, M. A. O. Louly and C. Prins, A reactive GRASP and path relinking for a combined production-distribution problem, Computers & Operations Research, 34 (2007), 3402-3419.
7 H. I. Calvete, C. Galé and M. J. Oliveros, Bilevel model for production-distribution planning solved by using ant colony optimization, Computers & Operations Research, 38 (2011), 320-327.
8 F. T. S. Chan, S. H. Chung and S. Wadhwa, A hybrid genetic algorithm for production and distribution, Omega, 33 (2005), 345-355.
9 K. Deb, A. Pratap, S. Agarwal, et al., A fast and elitist multiobjective genetic algorithm: NSGA-II, IEEE Transactions on Evolutionary Computation, 6 (2002), 182-197.
10 G. W. Depuy, J. S. Usher, R. L. Walker, et al., Production planning for remanufactured products, Production Planning & Control, 18 (2007), 573-583.
11 H. H. Doh and D. H. Lee, Generic production planning model for remanufacturing systems, Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 224 (2010), 159-168.
12 E. Gebennini, R. Gamberini and R. Manzini, An integrated production-distribution model for the dynamic location and allocation problem with safety stock optimization, International Journal of Production Economics, 122 (2009), 286-304.
13 M. Gen and A. Syarif, Hybrid genetic algorithm for multi-time period production/distribution planning, Computers & Industrial Engineering, 48 (2005), 799-809.
14 B. Golany, J. Yang and G. Yu, Economic lot-sizing with remanufacturing options, IIE Transactions, 33 (2001), 995-1003.
15 P. Hansen, B. Jaumard and G. Savard, New branch and bound rules for linear bilevel programming, SIAM Journal on Science and Statistical Computing, 13 (1992), 1194-1217.       
16 J. Holland, Adaptation in Natural and Artificial System, The University of Michigan Press, Ann Arbor, 1975.       
17 M. Y. Jaber and A. M. A. EI Saadany, The production remanufacture and waste disposal model with lost sale, International Journal of production Economics, 120 (2009), 115-124.
18 K. Kim, I. Song, J. Kim, et al., Supply planning model for remanufacturing system in reverse logistics environment, Computers & Industrial Engineering, 51 (2006), 279-287.
19 Y. J. Li, J. Zhang, J. Chen, et al., Optimal solution structure for multi-period production planning with returned products remanufacturing, Asia-Pacific Journal of Operational Research, 27 (2010), 629-648.       
20 Y. J. Li, J. Chen and X. Q. Cai, Uncapacited production planning with multiple product types, returned product remanufacturing, and demand substitution, OR Spectrum, 28 (2006), 101-125.       
21 Y. J. Li, J. Chen and X. Q. Cai, Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing, International Journal of Production Economics, 105 (2007), 301-317.
22 T. F. Liang and H. W. Cheng, Application of fuzzy sets to manufacturing/distribution planning decisions with multi-product and multi-time period in supply chains, Expert Systems with Application, 36 (2009), 3367-3377.
23 T. F. Liang, Fuzzy multi-objective production/distribution planning decisions with multi-product and multi-time period in a supply chain, Computers & Industrial Engineering, 55 (2008), 676-694.
24 T. F. Liang, Application of fuzzy sets to manufacturing/distribution planning decisions in supply chains, Information Science,18 (2011), 842-854.
25 S. S. Liu and L. G. Papageorgiou, Multiobjective optimisation of production, distribution and capacity planning of global supply chain in the process industry, Omega, 41 (2013), 369-382.
26 R. Manzini and E. Gebennini, Optimization models for the dynamic facility location and allocation problem, International Journal of Production Research, 46 (2008), 2061-2086.
27 L. Özdamar and T. Yazgac, A hierarchical planning approach for a production-distribution system, International Journal of Production Research, 16 (1999), 3759-3772.
28 Z. D. Pan, J. F. Tang and O. Liu, Capacitated dynamic lot sizing problems in closed-loop supply chain, European Journal of Operational Research, 198 (2009), 810-821.       
29 P. Piñeyro and O. Viera, The economic lot-sizing problem with remanufacturing and one-way substitution, International Journal of Production Economics, 124 (2010), 482-488.
30 D. F. Pyke and M. A. Cohen, Performance characteristics of stochastic integrated production-distribution system, European Journal of Operational Research, 68 (1993), 23-48.
31 D. F. Pyke and M. A. Cohen, Multiproduct integrated production-distribution system, European Journal of Operational Research, 74 (1994), 18-49.
32 K. Richter and M. Sombrutzki, Remanufacturing planning for reverse Wagner/Whitin models, European Journal of Operational Research, 121 (2000), 304-315.
33 K. Richter and J. Weber, The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost, International Journal of Production Economics, 71 (2001), 447-456.
34 N. Rizk, A. Martel and S. D'Amours, Multi-item dynamic production-distribution planning in process industries with divergent finishing stages, Computers & Operations Research, 33 (2006), 3600-3623.
35 T. Schulz, A new Silver-Meal based heuristic for single-item dynamic lot sizing problem with returns and remanufacturing, International Journal of Production Research, 49 (2011), 2519-2533.
36 H. Selim, C. Araz and I. Ozkarahan, Collaborative production-distribution planning in supply chain: A fuzzy programming approach, Transportation Research Part E, 44 (2008), 396-419.
37 M. Srinivas and L. M. Patnaik, Adaptive probabilities of crossover and mutation in Genetic Algorithm, IEEE Transaction on Systems, Man and Cybernetics, 24 (1994), 656-667.
38 R. H. Teunter, Z. P. Bayindir and W. V. D. Heuvel, Dynamic lot sizing with product returns and remanufacturing, International Journal of Production Research, 44 (2006), 4377-4400.
39 L. N. Vicente, G. Savard and J. J. Judice, Descent approaches for quadratic bilevel programming, Journal of Optimization Theory and Applications, 81 (1994), 379-399.       
40 X. P. Wang and L. M. Cao, Genetic Algorithm-Theory, Application and Software Implementation, Xi An Jiao Tong University Press, Shan Xi, 2002.
41 A. Xanthopoulos and E. Iakovou, On the optimal design of the disassembly and recovery processes, Waste Management, 29 (2009), 1702-1711.
42 P. Yılmaz and B. Çatay, Strategic level three-stage production distribution planning with capacity expansion, Computers & Industrial Engineering, 51 (2006), 609-620.
43 F. Zaman, S. M. Elsayed, T. Ray, et al., Configuring two-algorithm-based evolutionary approach for solving dynamic economic dispatch problems, Engineering Applications of Artificial Intelligence, 53 (2016), 105-125.
44 J. Zhang, X. Liu and Y. L. Tu, A capacitated production planning problem for closed-loop supply chain with remanufacturing, International Journal of Advanced Manufacturing Technology, 54 (2011), 757-766.

Go to top