`a`
Journal of Industrial and Management Optimization (JIMO)
 

Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments
Pages: 1059 - 1071, Issue 4, October 2015

doi:10.3934/jimo.2015.11.1059      Abstract        References        Full text (333.2K)           Related Articles

Ata Allah Taleizadeh - School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran (email)
Solaleh Sadat Kalantari - School of Industrial and Systems Engineering, College of Engineering, University of Tehran, Tehran, Iran (email)
Leopoldo Eduardo Cárdenas-Barrón - School of Engineering and Sciences, Tecnológico de Monterrey, E. Garza Sada 2501 Sur, C.P. 64849, Monterrey, Nuevo León, Mexico (email)

1 S. Banerjee and A. Sharma, Optimal procurement and pricing policies for inventory models with price and time dependent seasonal demand, Mathematical and Computer Modeling, 51 (2010), 700-714.       
2 W. M. Chan, R. N. Ibrahim and P. B. Lochert, A new EPQ model: Integrating lower pricing, rework and reject situations, Production Planning & Control, 14 (2003), 588-595.
3 K. K. Chen, M.-F. Wu, S. W. Chiu and C.-H. Lee, Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework, Expert Systems with Applications, 39 (2012), 2232-2235.
4 S. Chiu, H. Lin, M. Wu and J. Yang, Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues, ScienticaIranica, 18 (2011), 1537-1544.
5 S. W. Chiu, D. C. Gong, C. L. Chiu and C. L. Chung, Joint Determination of the production lot size and number of shipments EPQ model with rework, Mathematical and Computational Applications, 16 (2011), 317-328.
6 S. W. Chiu, Y. S. P. Chiu and J. C. Yang, Combining an alternative multi delivery policy into economic lot size problem with partial rework, Expert Systems with Applications, 39 (2012), 2578-2583.
7 L. E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers & Industrial Engineering, 57 (2009), 1105-1113.
8 L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments, Applied Mathematical Modelling, 37 (2013), 5549-5554.       
9 L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework, Mathematical and Computational Applications, 18 (2013), 132-138.
10 L. E. Cárdenas-Barrón, A. A. Taleizadeh and G. Trevino-Garza, An improved solution to the replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework, Expert Systems with Applications, 39 (2012), 13540-13546.
11 C. Y. Dye, A finite horizon deteriorating inventory model with two-phase pricing and time varying demand and cost under trade credit financing using particle swarm optimization, Swarm and Evolutionary Computation, 5 (2012), 37-53.
12 J. T. Hsu and L. F. Hsu, Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns, Computers & Industrial Engineering, 64 (2013), 389-402.
13 F. W. Harris, How many parts to make at once, Factory, The Magazine of Management, 10 (1913), 135-136, 152.
14 A. M. M. Jamal and B. R. Sarker, An optimal batch size for a production system operating under a just-in-time delivery system, International Journal of Production Economics, 32 (1993), 255-260.
15 I. Konstantaras, K. Skouri and M. Y. Jaber, Inventory models for imperfect quality items with shortages and learning in inspection, Applied Mathematical Modelling, 36 (2012), 5334-5343.       
16 R. Maihami, K. Nakhai and I. Abadi, Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging, Mathematical and Computer Modelling, 55 (2012), 1722-1733.       
17 S. Pal, M. K. Maiti and M. Maiti, An EPQ model with price discounted promotional demand in an imprecise planning horizon via Genetic Algorithm, Computers & Industrial Engineering, 57 (2009), 181-187.
18 B. Pal, S. S. Sana and K. Chaudhuri, Multi-item EOQ model while demand is sales price and price break sensitive, Economic Modelling, 29 (2012), 2283-2288.
19 B. Pal, S. S. Sana and K. Chaudhuri, A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption, Economic Modelling, 29 (2012), 1891-1898.
20 S. Papachristos and K. Skouri, An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging, International Journal of Production Economics, 83 (2003), 247-256.
21 S. H. R. Pasandideh, S. T. Akhavan Niaki and J. Aryan Yeganeh, A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages, Advances in Engineering Software, 41 (2010), 306-314.
22 S. Ray, Y. Gerchak and E. M. Jewkes, Joint pricing and inventory policies for make-to-stock products with deterministic price-sensitive demand, International Journal of Production Economics, 97 (2005), 143-158.
23 S. S. Sana, An economic order quantity model for nonconforming quality products, Service Science, 4 (2012), 331-348.
24 S. S. Sana, Sales team's initiatives and stock sensitive demand - A production control policy, Economic Modelling, 31 (2013), 783-788.
25 S. S. Sana, Optimal production lot size and reorder point of a two-stage supply chain while random demand is sensitive with sales teams' initiatives, International Journal of Systems Science, (2014), p85.
26 S. S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain, Decision Support Systems, 50 (2011), 539-547.
27 S. S. Sana, A production-inventory model in an imperfect production process, European Journal of Operational Research, 200 (2010), 451-464.       
28 A. A. Taleizadeh, H. M. Wee and S. G. Jalali-Naini, Economic production quantity model with repair failure and limited capacity, Applied Mathematical Modelling, 37 (2013), 2765-2774.       
29 A. A. Taleizadeh, S. T. AkhavanNiaki and A. A. Najafi, Multi product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint, Journal of Computational and Applied Mathematics, 233 (2010), 1834-1849.       
30 A. A. Taleizadeh, L. E. Cárdenas-Barrón, J. Biabani and R. Nikousokh, Multi products single machine EPQ model with immediate rework process, International Journal of Industrial Engineering Computations, 3 (2012), 93-102.
31 G. Trevino-Garza, K. Castillo-Villar and L. E. CCárdenas-Barrón, Joint determination of the lot size and number of shipments for a family of integrated vendor-buyer systems considering defective products, International Journal of Systems Science, (2014), p29.
32 D. M. Tsai, Economic production quantity concerning learning and the reworking of imperfect items, Yugoslav Journal of Operations Research, 22 (2012), 313-336.       
33 A. Yassine, B. Maddah and M. Salameh, Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model, International Journal of Production Economics, 135 (2012), 345-352.

Go to top